Tenant improvement electrical work is the wiring, power and lighting changes made when a business moves into or reworks a commercial space. In the Portland metro, that can mean turning a former retail unit into a clinic, fitting out an office suite in Hillsboro, or adding equipment circuits to a restaurant space in Vancouver. The electrical scope is often the part of a tenant improvement (TI) that sets the schedule, because it depends on the building’s existing service, the new layout and the equipment you plan to run.

This guide explains what TI electrical work usually includes, what to check before you sign a lease, and how to keep the project on time. To talk through a space, call Peak Electric Group at 503-397-7818.

What tenant improvement electrical work includes

Every space is different, but most commercial TI projects involve some mix of the following:

  • Service and panel review: confirming the space has enough capacity for the new use, and adding or upgrading panels or subpanels if not.
  • New circuits and outlets: for workstations, break rooms, point-of-sale systems, medical or salon equipment, and kitchen appliances.
  • Dedicated equipment circuits: for compressors, ovens, walk-in coolers, machinery or server racks.
  • Lighting: new layouts, LED fixtures and lighting controls.
  • HVAC wiring: power for new or relocated rooftop units, mini splits and exhaust fans.
  • Demolition and make-safe: removing or capping wiring from the previous tenant’s layout.
  • Exit and emergency lighting: keeping egress lighting in line with the new floor plan.

Our commercial electrical services page lists the full range of work we handle for Portland metro businesses.

Check the electrical before you sign the lease

The cheapest time to find an electrical problem is before the lease is signed. A few questions can save weeks later.

Is there enough capacity?

A space that worked for a small office may not support a restaurant, gym or light manufacturing. Ask for the size of the service and panel feeding your unit, and have an electrician compare it with your equipment list. If an upgrade is needed, the utility may also need to be involved, which adds lead time. Our post on upgrading a business electrical system for more capacity covers the warning signs.

Who pays for what?

Many commercial leases include a TI allowance from the landlord, with the tenant covering anything above it. Some leases make the landlord responsible for base building systems, including the main electrical service. Read the lease closely, and get the electrical scope priced before you negotiate the allowance.

What did the last tenant leave behind?

Older Portland commercial buildings can have several layers of past tenant wiring. Abandoned circuits, mislabeled panels and junction boxes hidden above ceilings are common. A walkthrough with an electrician helps you understand what needs to come out.

Permits, plans and inspections

Commercial electrical work in the Portland metro normally needs an electrical permit and inspection. Larger TI projects may also need drawings and coordination with the building permit for the whole space. Requirements depend on the city and on whether the space is in Oregon or Washington, so confirm them early.

A licensed electrical contractor pulls the electrical permit and schedules inspections at the right stages, usually after rough-in and again at final. Missing an inspection before walls are closed can mean opening them again. If you are working with a general contractor, agree up front who is managing which permits.

Keeping your TI project on schedule

Finalize equipment early

Circuits are sized to the equipment. If a range, compressor or piece of machinery changes after rough-in, wiring may have to change too. Share final specifications with your electrician as early as possible.

Order long-lead items

Panels, switchgear and some specialty fixtures can take weeks to arrive. Ask your electrician which items to order first.

Plan around neighbors and open hours

In occupied buildings, shutting off power can affect other tenants. Work that needs a shutdown is often scheduled early in the morning or after hours, and planned with the property manager.

Coordinate the trades

Electrical rough-in needs to happen after framing and before drywall, alongside plumbing and HVAC. Regular check-ins between the trades help avoid rework.

Portland, Hillsboro and Vancouver: what changes by location

The Portland metro spans two states. A TI project in Vancouver follows Washington licensing and inspection rules, while work in Portland or Hillsboro follows Oregon’s. Building types differ too. Portland’s older commercial districts often mean working around existing wiring, while newer Hillsboro and Vancouver business parks are more likely to raise questions about capacity for production or technology equipment.

Why businesses work with Peak Electric Group

Peak handles commercial tenant improvements, panel and service upgrades, LED lighting retrofits, troubleshooting and maintenance across the Portland-Vancouver metro. We are licensed in Oregon (CCB #206443) and Washington (Lic #PEAKEEG854KA), a NECA member contractor working with IBEW Local 48, and employee-owned. Our owners have over 35 years of combined experience, and we have served the region since 2015. Each job receives the same attention to detail, from start to finish, no matter the size of the project.

Frequently asked questions

How long does TI electrical work take?

It depends on the size of the space, the permit process and whether a service upgrade is needed. A small office refresh can move quickly. A full restaurant build-out takes much longer. We give you a timeline once we have seen the space and the equipment list.

Can work be done while the business is open?

Often, yes. Work can be phased, and shutdowns can be scheduled outside business hours.

Do I need drawings for the electrical permit?

Larger commercial projects often do. Your electrician and the local permit office can confirm what your project needs.

Should I hire the electrician directly or through my general contractor?

Either can work. For electrical-heavy projects, some tenants bring the electrician in early to price the scope before the lease is signed.